The Triangle West TPO Board approved the Public Engagement Plan and schedule for use in developing the 2050 Metropolitan Transportation Plan (MTP) at their Board meeting on September 9, 2020. A copy of the Plan and schedule are available at the links below. Note that some details of the plan and schedule could change, as needed, because of technical circumstances and the ongoing Covid-19 social distancing requirements.
The public engagement period to review the draft versions of the Plan and schedule was from June 10, 2020 through August 13, 2020. The public provided feedback through the survey, written comments, and the public hearing at the August 12, 2020 Board meeting.
The Triangle West TPO Board approved a set of Goals and Objectives for use in developing the 2050 Metropolitan Transportation Plan (MTP) at their Board meeting on September 9, 2020. A copy of these Goals and Objectives, which will drive the TPO’s policies and decision-making over the next several years, is available at the link below. The remainder of this web page provides information on the process to develop the Goals and Objectives.
As part of the Goals and Objectives development, the TPO conducted an online survey (in both English and Spanish) to understand support for proposed goals and policies. Over 2,100 respondents completed the survey, which was open from July 2nd through August 13th. The presentation at the link below provides survey results. These results are from a point that was a few weeks before the survey closed but are likely to similar to the final survey results (which are to be analyzed at a later date).
The public engagement period was from June 10, 2020 through August 13, 2020. The public provided feedback through the survey, written comments, and the public hearing at the August 12, 2020 Board meeting.
The interactive maps below are showing congestion and population and employment growth.
The Triangle West TPO wants feedback on how this Deficiency and Needs Analysis does, or does not, identify needed transportation improvements. Is there a transportation deficiency that this analysis does not identify? Are the assumptions, such as population and employment growth, correct? Send your comments to colleen.mcgue@twtpo.org, or contact Colleen McGue directly at 919-503-4115.
The Deficiency Analysis compares today’s travel conditions with that of the year 2050, assuming that no additional transportation infrastructure and services are realized. Thus, the Deficiency Analysis shows where investments in highways, transit and other travel modes are needed to address the future travel demands. It will guide the development and evaluation of the various transportation alternatives that will be considered in a subsequent step of the 2050 MTP development.
The measures and maps are based on a travel demand model that estimates conditions in two different years:
This is 2016 population and employment using the existing transportation system of streets, transit, etc., and reflects the current travel conditions.
This is the estimated 2050 population and employment using the existing transportation system plus any projects that are committed to construction or implementation. “E+C” means “Existing plus Committed.” This “no build” scenario allows us to see where future deficiencies are to be expected.
With the TPO’s Goals and Objectives in mind, staff will use the deficiency data to create several alternatives to meet the future travel demand. This Alternatives Analysis will be released to the public and will include public meetings and a hearing to help gather people’s comments.
This Web page provides the detailed tables and maps that comprise the Deficiency Analysis and presents the Socioeconomic Data (SE Data) used to generate the analysis. The following link is a presentation that helps to understand the Deficiency Analysis data and graphics.
It is important to note that the public input process for the TPO’s Goals and Objectives identified a strong interest in equity, the environment, non-motorized modes such as bicycling and walking, and high capacity transit. These topics must be kept in mind while examining the Deficiency Analysis data to develop a comprehensive, accurate survey of the region’s transportation needs. The Goals and Objectives summary below and the Goals section above provide additional information.
The congestion maps estimate the level of congestion in the year 2050 if no additional transportation projects are implemented. This is often called the No Build Scenario. In this case, the travel demand model puts the trip demand for the 2050 population and 2050 employment on to the current transportation network that might also have a few additional approved projects (e.g., East End Connector and Alston Avenue widening) that are close to beginning construction or completion. The maps depict the level of congestion by dividing the traffic volume by the road capacity. So, if the road has 8,000 vehicle trips per hour and the road capacity is 10,000 vehicles; the V/C (volume to capacity value) will be 0.80.
Note that the TPO's travel demand model uses a Level of Service (LOS) of "E" to depict the situation where the volume is equal to capacity, or V/C = 1. Most motorists would experience LOS E as very congested, especially in urban areas and those areas with intersections and driveways. Motorists would experience a V/C higher than 1 as highly congested (orange lines on map), and a V/C higher than 1.2 as long delays (red lines on map).
The thumbnail maps at the top of this page provide 2016 and 2050 interactive maps for the daily congestion level.
The congestion maps below show the daily average V/C for both roadway directions. Roadways in which the V/C exceeds 1 are labeled with the actual V/C value.
The table below show the travel time between key destinations in the Triangle region in 2016 and 2050, and calculates the change in that travel time. These travel times are for the morning and afternoon peak hour.
An isochrone map shows lines that connect the points that have the same travel time from a specified point. The isochrone maps below show the 2016 and 2050 travel time to key destinations in the Triangle region in fifteen-minute increments for the afternoon peak hour. The destinations are the downtowns or center of Durham, Chapel Hill, Raleigh and the Research Triangle Park.
The Performance Measures are a broad set of calculations that provide an indicator of the mobility, trip volume, mode choice and congestion in the overall transportation system. The measures are not specific to a travel corridor or transportation project but are useful for broad comparisons of different transportation system alternatives. The first table below compares the 2016 and the 2050 Existing plus Committed (E+C, also known as the No Build) models for the Triangle West TPO. The second table provides the same data at the county level.
The Central Pines Regional Council, in partnership with the TPO, forecasts Socioeconomic Data, such as dwelling units, population and employment, to the year 2050. The guide totals document below shows the expected population and employment growth from 2016 through 2050 for Triangle counties. These guide totals are input to a land use model called Community Visualization that uses a set of development rules and available land information to further geographically distribute county-level population and employment growth. The sets of maps use a color intensity scale to depict the forecasted distribution for population and employment growth from 2016 to 2050. There is a set of PDF maps below, and the icon at the top of this Web page provides the same data in an interactive map.
2050 Population and Employment Density(opens in a new tab)
Congestion Maps(opens in a new tab)
Alternatives Analysis -- Overview
An Alternative is a combination of a transportation network and land use assumption that are used to create a scenario for public discussion. The following document provides a short description of the various Alternatives. The final 2050 MTP will be a combination of projects and policies from different Alternatives – it will not be the adoption of a single Alternative.
What are the three Alternatives? (PDF, 911.08 KB)(opens in a new tab)
Key Performance Measures (PDF, 304.27 KB)(opens in a new tab)
Note that in a separate process, county transit plans are being developed. See the following linked titles for information on public comment opportunities: Durham County Transit Plan(opens in a new tab); and, Orange County Transit Plan(opens in a new tab).
Public Engagement
The following links provide information on opportunities for the public to provide input on the 2050 MTP:
Colleen McGue
Triangle West TPO
4307 Emperor Blvd
Durham, NC 27703
colleen.mcgue@twtpo.org
Contact Us
For more information, citizens can contact:
Colleen McGue
919-503-4115
colleen.mcgue@twtpo.org
Transportation Networks and Land Use
The Alternatives Analysis – Overview section above discusses how each Alternative is composed of a mobility foundation (transportation network) and development foundation (land use assumption). The following maps provide details on these foundations:
Additional demographic and land use information
Alternatives Analysis Data and Maps
Performance Measures (PMs)
The Triangle West TPO developed a set of Goals and Objectives that are aligned with Performance Measures. As the TPO develops the data for the Performance Measures, the links below will present that data. The roman numerals in parenthesis references the Performance Measure table.
Congestion Maps
The interactive map at the top of this Web page provides the daily congestion values for the principal roadway segments in the TPO for all three scenarios. The following document is a primer to understanding the congestion maps.
Travel Choice Neighborhoods (TCN)
Travel Choice Neighborhoods (TCN) focus on the change in mode choice in areas that are expected to experience significant transit investment.
Measures of Effectiveness (MOEs)
Travel Time – Activity Centers
The tables in the document below compare the travel time between key destinations in the Triangle for the No Build (2050 E+C) and Balanced and Equitable (All Together) scenarios.
Isochrone Maps
The document link below presents the isochrone travel market maps for different centers and Alternatives.
How to Participate
The Triangle West TPO has released the Preferred Option for the 2050 Metropolitan Transportation Plan (MTP) for a 42-day public comment period that ran from October 27, 2021, through December 7, 2021. The public can provide input by:
Public Hearing: The TPO Board will conduct a public hearing on November 10, 2021, 9 am, via an online meeting. The public can speak directly to the Board on the Preferred Option by sending a request to address the Board at the hearing to colleen.mcgue@twtpo.org.
Comments: The public sent comments on the Preferred Option. Staff compiled the public comments, forwarded them to the TPO Board, and drafted a response to the comments. The comments and responses are compiled in the document below:
Compiled Comments (PDF, 3.11 MB)(opens in a new tab) (as of 2/8/2022)
Contact
For more information, the public can contact:
Colleen McGue
Triangle West TPO
4307 Emperor Blvd
Durham, NC 27703
colleen.mcgue@twtpo.org
Next Steps
At their December 8, 2021, meeting, the TPO Board will make final changes to the 2050 MTP and approve a draft to be used in the Air Quality Conformity Determination process. The Board can adopt the 2050 MTP at either their January 12 or February 9, 2022 meetings. The public can always request to speak directly to the Board at these meetings.
Preferred Option
Links to the full report and report sections are shown below. Interactive maps of the highway and major transit projects are at the top of this Web page.
Preferred Option (complete report) (PDF, 13.7 MB)(opens in a new tab)
Report by sections:
Table of Contents (PDF, 520.58 KB)(opens in a new tab)
Creating the Preferred Option (PDF, 969.62 KB)(opens in a new tab)
Goals and Objectives(opens in a new tab)
Land Use (Socioeconomic Data)(opens in a new tab)
Transit (PDF, 4.56 MB)(opens in a new tab)
Bicycle and Pedestrian (PDF, 1000.59 KB)(opens in a new tab)
Financial Plan (PDF, 1.63 MB)(opens in a new tab)
Measures of Effectiveness (PDF, 1.42 MB)(opens in a new tab)
Public Comments
The Triangle West TPO has conducted many events to receive comments from the public over the last few months of MTP development. Links to a compilation of those comments are below:
September 2021 Public Hearing (PDF, 1.75 MB)(opens in a new tab)
Compilation of Comments Provided by Email(opens in a new tab)
Survey Results and Low Income/Minority Focus Groups (PDF, 1.32 MB)(opens in a new tab)
Performance Measures
The Triangle West TPO and Capital Area MPO jointly developed the 2050 MTP. The MPOs also adopted very similar goals and objectives, and identified performance measures for each objective. The table in the first document below shows the alignment of the goals, objectives and performance measures. The subsequent documents present an explanation for each of the measures and the resulting values for both MPOs. The measures are listed in the order that they appear in the alignment table and a parenthetical contains the roman numeral reference to that table. The MPOs are not able to produce all of the proposed performance measures often because the data is not available or not reliable, or requires a disproportionate level of staff resources. Those measures that will be produced for the 2050 MTP are listed below, and those measures that will not be produced are still listed in the alignment table with the intent of producing them in the future.
The MPOs also produce a set of detailed Measures of Effectiveness (MOEs) using the Triangle Regional Model (TRM) for the 2050 MTP. The Triangle West TPO’s MOEs area presented on the 2050 MTP Adopted(opens in a new tab) web page.
Triangle West TPO Adopts 2050 MTP
The Triangle West TPO adopted the 2050 MTP on February 9, 2022.
Contact
For any questions concerning the 2050 MTP, contact Colleen McGue at colleen.mcgue@twtpo.org, 919-503-4134.
2050 MTP Report
The final report contains the roadway and transit projects, financial plan, and policies of the 2050 MTP. The report also contains performance measures and analysis on the extent to which the plan and process meet other standards such as environmental justice, federal planning criteria, and air quality conformity.
Single document
By Chapters
By Appendices
Maps
The icons at the top of this web page provide links to interactive highway, regional transit, congestion, and population and employment maps. For the original maps included in the 2050 MTP, please visit our 2050 MTP archive. PDF versions of the highway and transit maps are available below.
Public Comments
The public comments received in response to the 2050 MTP final report and the staff responses are compiled in the document below.
Congestion Maps
The interactive map at the top of this web page provides the daily congestion values for the principal roadway segments in the TPO for the current, no-build, and adopted 2050 MTP. The following document is a primer to understanding the congestion maps.
Measures of Effectiveness (MOEs)
The Triangle TPO produces measures of effectiveness (MOE) that are based on the output data of the Triangle Regional Model (i.e., travel demand model). The document below provides background on the MOEs, graphics of the most important measures, and a table of all the measures. The TPO also produces a separate set of performance measures that are aligned with the TPO’s goals and objectives. See the 2050 MTP/Performance Measures web page for those measures.
Land Use – Population & Jobs
The population and employment map at the top of this page displays the projected 2050 population and employment (jobs) in the Triangle area. The document below briefly describes the methodology for forecasting population and employment, land use assumptions, and provides county-level forecasts. Additional information on land use can be found in chapter six of the report, which is available in a section above.
The Triangle West TPO Board released Amendment #1 to the 2050 Metropolitan Transportation Plan (MTP) for a public comment period from June 27 through August 7, 2023. The Triangle West TPO Public Involvement Policy requires this minimum public input period of 42 days for a major MTP amendment. It was noted that the MTP identifies the future highway, public transportation, bicycle, pedestrian and other transportation projects and that projects cannot be funded in the Transportation Improvement Program (TIP) unless they are included in the MTP. The Triangle West TPO adopted the FY 2024-2033 TIP on August 9, 2023, and thus the following projects required amendment in the 2050 MTP to allow these projects to go forward in the TIP:
The documents below include the approved amendment and public feedback:
For additional information, please contact:
Yanping Zhang
Triangle West TPO
4307 Emperor Blvd
Durham, NC 27703
(919) 503-4125
Yanping.Zhang@twtpo.org